Commercial Property Inspection Checklist
A commercial property inspection checklist template for due diligence on a building somebody is about to buy, lease or take over. Every finding carries an estimated cost and a timing band, because the question a buyer is actually asking is never what is wrong with the property. It is what the first three years will cost, and who is going to pay for it.
- Every finding costed, and placed in a timing band
- Identified cost expressed as a share of the deal
- Missing documents treated as findings in their own right
- What could not be inspected, stated rather than implied
Commercial Property Inspection
Costed, and timed
| # | COSTED FINDINGS BY TIMING | TIMING | EST. COST | WHO PAYS |
|---|---|---|---|---|
| 1 | Roof covering, single ply at 18 years | |||
| 2 | Cooling plant, age and refrigerant type | |||
| 3 | Electrical condition report out of date |
The document you will get. Download for the full, editable file.
Who this commercial property inspection is for
One building, one transaction, and four people reading the same report for different numbers.
Whoever carries out the inspection
A structure that forces a cost and a timing band against every finding, and an access limitations field that protects the report from implying more than it saw.
The buyer or the board
One line: identified cost as a share of the deal. It is the only figure in the document that gets read in a meeting and the only one that moves a price.
Whoever will run the building afterwards
Plant ages and the Year 1 to 3 band, because that is next year's budget arriving early enough to plan rather than react to.
The lawyer or agent
The who pays column and the documents table. Between them they decide what is negotiated now and what is inherited silently.
Where buildings change hands
The structure suits any commercial building being transacted. What changes is who carries the repairing obligation afterwards. If you run one of these, the sector page goes further than the template does.
- Commercial real estate
Acquisitions and lease events across a portfolio, where cost per unit of area is what makes two very different buildings comparable.
Portfolio maintenance software - Corporate facilities
Taking on an office, where the fit-out suits the seller's operation rather than yours and reinstatement is somebody's liability.
Corporate facilities software - Retail and malls
Stores and units at lease commencement and expiry, where the schedule of condition decides the dilapidations conversation years later.
Retail maintenance software - Healthcare
Clinical premises, where statutory compliance gaps are not negotiable and the documents table matters more than the fabric.
Healthcare maintenance software - Education
Campus acquisitions and transfers, where plant age across several buildings arrives as one capital problem.
Campus maintenance software - FM service providers
Advising a client pre-acquisition, where the deliverable is a costed position rather than a condition narrative.
FM service provider software
What a commercial property inspection should cover
A commercial property inspection is a costed condition survey carried out for a transaction. It covers structure, envelope and roof, interior and accessibility, building services, and the site with its compliance position, then places every finding in a timing band with an estimated cost and an owner, and reports the total as a share of the price under discussion.
A. What it costs, when, and whose problem it is
| Field | What goes in it | Why it earns its place |
|---|---|---|
| Property and instruction | Type, areas, tenure, occupancy and the purpose of the inspection | Purpose changes the reading. An acquisition survey and a lease expiry survey look at the same building and care about completely different findings. |
| Access limitations | What could not be seen, stated explicitly | Roof voids, occupied tenant demises, live plant and anything behind a locked door. A report silent about them implies they were checked, which is the most expensive implication in the document. |
| Structure, envelope and roof | Twelve items, each with an observation and an estimated cost | Roof age and remaining life is the one to establish first: routinely the largest single line in the first five years and the one most often absent from a seller's pack. |
| Interior, fit-out and accessibility | Twelve items including tenant alterations and reinstatement obligations | Whether alterations were consented, and what has to be put back at lease end. Both are liabilities that travel with the building and neither is visible. |
| Building services | Fourteen items, each with an age as well as a condition | Age matters more than condition here. Plant that all works and is all twenty-two years old is a single capital event waiting for a trigger. |
| Site, compliance and environment | Twelve items from parking and drainage to contamination and invasive species | Includes statutory certificates current and available, which is where a condition survey crosses into a compliance position. |
| Costed findings by timing | Element, finding, timing, estimated cost, who pays and priority | Timing is Immediate, Year 1, Year 1 to 3 or Year 4 to 10, spelled exactly that way so the summary counts it. |
| Who pays | Landlord or tenant, against every line | The column that turns a condition report into a negotiating position. The same defect is a price reduction, a service charge item or nothing at all depending on this field. |
| Documents requested and received | Fifteen, each with requested, received and current | A document that was asked for and not produced is a finding. The cost of establishing the position belongs in the costed table alongside the fabric. |
| Identified cost per unit of area | Total over gross area | What makes two buildings comparable. A written report never does this; a single rate per unit of area puts very different properties side by side. |
| Identified cost as a share of the deal | Total over the price or rent under discussion | The figure a buyer or a board actually acts on, and the reason the whole document is costed rather than described. |
| Immediate and Year 1 cost | Separated from the rest | Because that is the money being spent before the building produces anything, and it is a different conversation from a ten year forecast. |
The reason every finding on this document carries a number is that a list of defects, however well written, almost never changes what somebody pays for a building. A surveyor can describe a tired roof, an electrical installation nearing the end of its condition report cycle and a chiller running on a refrigerant being phased out, and all of it is true, and the transaction proceeds unchanged, because none of it has been converted into the only unit the other side is thinking in. Put the same three findings in a table with estimated costs and timing bands, total them, and divide by the consideration, and the conversation changes character entirely: the question stops being whether the building is in reasonable condition for its age, which it usually is, and becomes whether the buyer wants to absorb a figure equal to some percentage of the price in the first three years. That is a question with an answer, and the answer is frequently a price adjustment or a retention. The timing bands do the second half of the work. Immediate and Year 1 costs land before the building has produced any return, which is money the buyer has to find on top of the purchase, while a Year 4 to 10 item is a capital planning note rather than a negotiating point. Separating them stops a large ten year total frightening everybody about spend that is a decade away, and stops a modest immediate figure getting lost inside it. The who pays column completes the picture, because in a let building a great many of these findings are recoverable through a service charge or fall to a tenant under a repairing obligation, and a report that does not say so overstates the buyer's exposure as badly as one with no costs at all understates it.
B. What it looks like filled in
One office acquisition. Fourteen findings across four timing bands, and the number that will be quoted is the last one.
| Line | Value |
|---|---|
| Property, purpose | Office, 4,200 area, built 2009, acquisition |
| Findings by band | 2 Immediate, 4 Year 1, 5 Year 1 to 3, 3 Year 4 to 10 |
| Largest single line | Roof covering, single ply at 18 years, 86,000 |
| Total identified cost | 186,000 |
| Cost per unit of area | 44.29 |
| Share of the deal | 2.7 percent of 6,800,000 |
186,000 against a 6,800,000 deal is 2.7 percent, and that single figure is what the report will be remembered by. Everything above it is the evidence: fourteen findings, the largest of them a single-ply roof at eighteen years costed at eighty six thousand and placed in the Year 1 to 3 band, which is a long way from a crisis and close enough to matter to somebody about to own the building. Expressed as a list, none of that moves a price. Expressed as 2.7 percent of the consideration, it becomes a number the buyer can weigh against the yield and the board can decide about in a sentence. The cost per unit of area does a different job and is worth producing even when there is no transaction: at 44.29 this building can be set beside another of a completely different size, age and type, and the comparison holds in a way no written report ever manages. The recommendation on this inspection was to proceed with conditions, which is the honest outcome for most buildings of this age. The longer view, where the same elements are forecast across their full renewal cycles rather than the first decade, is a building condition assessment, and the routine walk once the building is owned is the building maintenance checklist.
Word for the version a surveyor completes on site, Excel for the one that totals findings by timing band and works out cost per unit of area and share of the deal, with a Property Register that puts a whole portfolio side by side, and PDF for the report that goes to the buyer. Free, and yours to rebrand.
How do you inspect a commercial property?
Cost everything, band everything, and say what you could not see. Six steps.
Record the purpose and the access limitations first
Acquisition, lease event or portfolio review, and what you could not inspect. Silence about a locked plant room implies it was checked.
Establish the roof age and the plant ages early
Both are routinely the largest lines in the first five years and both are routinely missing from the seller's information pack.
Put an estimated cost against every finding
Not a description. A finding with no number attached cannot be totaled, compared or negotiated, which means in practice it will be none of those things.
Band each finding by timing
Immediate, Year 1, Year 1 to 3 or Year 4 to 10, spelled exactly that way. Immediate and Year 1 are money spent before the building returns anything.
Record who pays against each line
Landlord or tenant. In a let building a great deal of this is recoverable, and a report that ignores that overstates the buyer's exposure.
Request the documents, and cost the gaps
Fifteen of them. A register that was asked for and not produced is a finding, and establishing the position has a price that belongs in the table.
A defect list versus a share of the deal
The same inspection, reported two ways. One of them gets filed and one of them gets acted on.
| Aspect | A defect list | A share of the deal |
|---|---|---|
| What it contains | What is wrong | What it will cost, and when |
| Its unit | Condition language | Money, against the price |
| Who can act on it | A surveyor | A buyer or a board |
| What it changes | Rarely anything | The price, or a retention |
| What it misses | Whose liability it is | Nothing, if who pays is filled in |
| How long it takes to read | Forty pages | One line |
Both documents contain the same findings; the difference is entirely in whether the reader is being asked to form a judgment or to make a decision. A condition narrative asks a non-technical reader to weigh phrases like nearing the end of its serviceable life against each other and arrive at a view, which is work most buyers will not do and most boards cannot do in the time available. A costed, banded schedule does that work for them and presents the conclusion in the currency of the transaction. This is not about dramatising a building's condition; the honest total for a sound property of ordinary age is frequently a modest percentage, and saying so plainly is as useful as flagging a bad one, because it lets a deal proceed with confidence instead of vague unease. What the percentage must not do is absorb the detail behind it, which is why the position block keeps Immediate and Year 1 costs separate from the ten year total, splits landlord from tenant, and sits above a schedule where every line can be traced. Two adjacent documents cover the ground this one deliberately leaves alone: the long-range capital view across full renewal cycles belongs in a building condition assessment, and the recurring walk that catches things between transactions is the building maintenance checklist, with the planned regime itself in a commercial building maintenance schedule.
When the template starts to feel limiting
The file handles one property well. Four things get difficult across a portfolio or across time.
Comparing buildings means opening every file
Cost per unit of area is what makes them comparable, and on paper that is a row somebody retypes out of each report.
Year 1 findings become this year's findings
A timing band is written once and never moves. Nothing promotes a Year 1 to 3 item into a budget line when the year arrives.
The documents table is a snapshot
Certificates expire on their own schedules after the inspection, and the table says only what was true on the day.
Access limitations are forgotten first
The things nobody could see are the most important sentence in the report and the first thing dropped when it is summarized.
What running this in Facilio looks like
The inspection does not change. What changes is that the findings survive the transaction.
Asset Intelligence
Findings land on the asset
Plant ages, remaining life and costed findings attach to the building and its equipment, so the survey becomes the opening balance rather than a document in a data room.
Work Order Intelligence
Immediate findings become work
The two Immediate items turn into jobs with owners on day one of ownership instead of waiting to be re-read after completion.
Ops Performance Intelligence
Timing bands mature on their own
A Year 1 to 3 item surfaces when its year arrives rather than staying a band in a PDF nobody reopens.
Audit Report Intelligence
The portfolio sorts by cost per area
Which is the comparison a written report can never produce and the one an owner of several buildings most wants.
Hallucination-free by design. Atom AI answers from the records in your tenant rather than generating plausible text, so an empty field reads as empty rather than filled in for you.
Frequently asked questions
What is a commercial property inspection checklist?
It is a costed condition survey carried out for a transaction. This one covers twelve structure and roof items, twelve on interior and accessibility, fourteen building services and twelve on site and compliance.
Every finding gets an estimated cost, a timing band and an owner, and the totals convert into a cost per unit of area and a share of the price under discussion.
How is it different from a building condition assessment?
This one is transaction-driven and looks at the first decade, banded Immediate through Year 4 to 10, with a who pays column and a share-of-deal figure.
A building condition assessment is the long-range capital view across full renewal cycles, which is a different question asked by an owner rather than a buyer.
Why express findings as a share of the deal?
Because a list of defects, however well written, rarely changes what somebody pays. The same findings totaled and divided by the consideration become a number a board can decide about in a sentence.
It also works in the building's favor when the total is modest, since it lets a deal proceed with confidence rather than vague unease.
Why are missing documents treated as findings?
Because a building with no asbestos register is not a building without asbestos. The absence is an unknown with a cost attached to resolving it.
The template asks for fifteen documents with requested, received and current recorded separately, and the cost of establishing any missing position belongs in the costed table.
Why state what could not be inspected?
Because silence implies it was checked. Roof voids, occupied tenant demises, live plant and anything behind a locked door are exactly where the expensive surprises live.
An access limitations field protects both the reader and the surveyor, and it is the first thing lost when a report gets summarized.
What are the timing bands?
Immediate, Year 1, Year 1 to 3 and Year 4 to 10, spelled exactly that way so the summary counts them.
Immediate and Year 1 are reported separately from the total, because that is money spent before the building returns anything and it is a different conversation from a ten year forecast.
Why record the age of every plant item?
Because age predicts the capital event better than condition does. Plant that all works and is all the same age is one problem rather than none, and it arrives together.
A building with a sound roof and a plant room installed in a single fit-out twenty years ago has a concentrated renewal liability that a condition-only survey will rate as satisfactory.
Who should the who pays column be filled in by?
Whoever understands the lease position, which is frequently not the surveyor. The template carries the column so the question gets asked rather than assumed.
In a let building a great deal of this expenditure is recoverable or falls to a tenant under a repairing obligation, and ignoring that overstates a buyer's exposure as badly as omitting costs understates it.
In one paragraph
A commercial property inspection works when every finding carries an estimated cost, a timing band and an owner, because a list of defects rarely moves a price and the same list expressed as a percentage of the consideration usually does. Record the purpose and the access limitations first, establish the roof and plant ages early, treat a document that was requested and not produced as a finding with a cost, and keep Immediate and Year 1 money separate from the ten year total.
What the first three years cost
Cost every finding, band it by timing, say who pays and state plainly what you could not see. Once comparing two buildings means retyping figures out of two reports, or a Year 1 to 3 item never becomes a budget line when its year arrives, the paper version has reached its limit.