Work Order Completion Report

The closing document for a finished job. What was done, what it cost, whether it is genuinely resolved, how long the work is warranted for, and two signatures: the person who did it and the person who asked for it.

  • One outcome, ticked once: resolved, partial or escalated
  • Labor, parts, contractor and access, totalled with tax
  • A warranty window with the days left counting down
  • Satisfaction captured on site, not by email later
work-order-completion.xlsx

Work Order Completion Report

What closing the job actually means

Work order this closes
The number it answers to
Outcome
Resolved / Partial / Escalated
Total cost
Labor + parts + charges
Warranty expires
With days left
#Outcome, tick one onlyTickDetailBy
1Fully resolved, no further work needed
2Partial, follow-up work needed
3Escalated to another team, contractor or specialist
+ the reference block tying this to the original work order and what was actually requested, who completed it and when they were on and off site, a summary of the work with the cause and the tests done afterwards, a labor table and a parts table that total themselves, a full cost build-up with tax and what is chargeable, the follow-up section that opens when the outcome is not fully resolved, a warranty register with a countdown, the requester feedback block, and three signatures covering completion, acceptance and approval to charge

The document you will get. Download for the full, editable file.

Who this work order completion report is for

This is the one maintenance document that two different people sign for two different reasons, which is what makes it worth keeping.

  • The technician who did the work

    You are recording what happened, including the cause and the checks you ran afterwards. The summary and the outcome tick are the two fields that decide whether this job is genuinely finished.

  • The person who raised the request

    You accept the work and rate it. The original request is copied in as it was raised rather than as it was understood, so you are signing against what you actually asked for.

  • Facilities or operations manager

    You live with the follow-ups. The outcome split and the follow-up work order number are what stop a partial job from being filed as complete and reappearing as a new fault.

  • Whoever approves the charge

    Labor, parts, contractor charges and access are totalled separately before tax, so the number you approve can be explained line by line rather than defended as a lump sum.

Which section matters the most in your sector

The form is the same everywhere. What changes is who reads it afterwards, and that is usually whoever is being charged. If you run one of these, the sector page goes further than the template does.

What a work order completion report should contain

A work order completion report is the document that closes a finished job. It records what was done and why it failed, the labor and parts used and what the job cost, whether it is fully resolved or needs following up, the warranty attached, and the signatures of whoever completed it and whoever asked for it.

A. Fields specific to a completion report

FieldWhat goes in itWhy it earns its place
The work order it closesThe original number, the date raised, and the request as writtenCopying the request as it was raised rather than as it was understood is the point. The requester is signing against what they asked for, not against your interpretation of it.
Who completed it, and whenName, trade, in-house or contractor, plus time on and off siteTime on and off site is what makes labor hours checkable. It is also the field that settles the argument about whether anybody attended at all.
Summary of the work carried outWhat was done, the cause found, and the tests run afterwardsThe cause is the field most often left blank and the most useful later. Without it a repeat failure looks like bad luck rather than a pattern.
Condition the equipment was left inFully operational, operational with limitations, or out of serviceThree options rather than a yes or no, because operational with limitations is the real state more often than either extreme and it changes what happens next.
Labor tableDate, technician, hours and rate, with the line total calculatingHours against a named person and a rate is what turns a cost into something defensible. A single labor figure cannot be checked by anybody.
Parts and materialsPart number, description, quantity and unit costPart numbers matter beyond the invoice. They are what let you see the same component being replaced twice on the same asset inside a year.
Total cost build-upLabor, parts, contractor charges, access and hire, then taxSeparated before it is totalled, so the number can be explained line by line rather than defended as a lump sum, and so what is chargeable can be split off.
Outcome, ticked onceFully resolved, partial with follow-up, or escalatedOne tick only. This single field is the one that decides whether your completion statistics mean anything, and it is the one under the most pressure to be optimistic.
The follow-up blockWhat is left, why, the follow-up work order number, and whether the asset is safeIt opens only when the outcome is not fully resolved. Is the asset safe to use meanwhile is the line that must never be left blank on a partial.
Warranty registerItem, who covers it, the period, and the expiry with days leftA recurrence inside this window is a warranty call rather than a new chargeable job. Nobody ever checks unless the expiry date is written down at completion.
Requester feedbackA rating out of five, whether it was resolved, and whether response time was acceptableCollected on site while the technician is there. A survey emailed days later measures the email rather than the work, and almost nobody answers it.
Three signaturesCompleted by, accepted by the requester, and approved for chargingThree because they are three different statements. The technician says it is done, the requester says it is acceptable, and somebody separate says it can be charged.

If you keep only one field from this form, keep the outcome tick, and treat it as sacred. Everything else records the job. That one field records the truth about the job, and it is under constant quiet pressure to read fully resolved, because partial looks like failure on a dashboard. It is the opposite. A partial closed honestly, with a follow-up work order number against it, is a job under control. The same job closed as fully resolved disappears, comes back the following week as a new fault, and now shows up twice in your reactive numbers while nobody can see the two are connected. Teams that are strict about this one tick get a mean-time-between-failures figure they can trust. Teams that are not have a very tidy closure rate and no idea what is actually breaking.

B. What it looks like filled in

One completion report from the log: a rooftop unit that stopped cooling, fixed in a single visit, and closed in a way that will still make sense a year from now.

FieldWhat went inWhy it matters later
Work order closedWO-1102, raised 12 Dec, completed 14 DecTwo days is the response figure, and it is now evidenced
Cause foundRun capacitor failed, CAP-45-370 replacedThe cause, not just the fix
Cost2.5 hrs at 58.00 plus parts 18.50, 163.50 net, 196.20 with taxExplainable line by line, not a lump sum
OutcomeFully resolved, tested on full cooling cycleBacked by a test, so the tick means something
WarrantyCapacitor, manufacturer, 12 months to 14 Dec 2027A repeat before then is a warranty call
Satisfaction5, collected on site, requester signedRated by the person who raised it, while it was fresh

The two bold rows are what make this report worth more than a closed ticket. Recording the cause rather than only the fix means that if the same rooftop unit fails again in March, somebody can see it is the second capacitor in four months and start asking about voltage or heat rather than fitting a third. And the warranty row is money: a recurrence before December 2027 is a manufacturer claim, not a chargeable job, but only because the expiry date exists somewhere a person will look. Without it the second visit gets quoted, invoiced and paid in full by whoever raised it. The outcome tick is doing quiet work too. Fully resolved is backed here by a test on a full cooling cycle, which is the difference between a considered judgment and an optimistic one.

Download the work order completion report

Word for the copy a technician fills in and a requester signs, Excel for the labor and parts tables that total themselves plus the Completion Log that trends cost, outcome and satisfaction across jobs, PDF for the version that goes out with an invoice. Free, and yours to rebrand.

Get the template

How do you complete a work order completion report?

Fill it in at the end of the job, on site, with the requester still available to sign. Six steps, in the order the form runs.

  1. Tie it to the work order it closes

    The completion report number, the original work order number, the date it was raised and the date the work finished, who requested it, the site, the location and the asset. Then copy the original request in as it was written rather than as you understood it.

  2. Record who attended and when

    Name, trade, whether in-house or a contractor with the company named, anybody else who worked on it, the supervisor, and the times on and off site. Those two timestamps are what make the labor hours checkable afterwards.

  3. Write what was done, the cause, and the tests

    What was actually carried out, the cause of the problem where one was found, and the checks run afterwards to prove it. Then the condition the equipment was left in: fully operational, operational with limitations, or out of service.

  4. Total the cost honestly

    Labor by date, technician, hours and rate. Parts by number, description, quantity and unit cost. Then contractor charges, access or hire, the subtotal, the tax rate as a whole number, and what is chargeable to the requester rather than absorbed.

  5. Tick one outcome, and open section 8 if it is not resolved

    Fully resolved, partial, or escalated, and only one. If it is not fully resolved, record what still needs doing, why, the follow-up work order number, the target date, whether the asset is safe to use meanwhile, and that the requester has been told.

  6. Record the warranty, get the rating, get the signatures

    Warranty item, who covers it, the period and the expiry. Then the satisfaction rating while you are still standing there. Then the three signatures: completed by, accepted by the requester, and approved for charging.

A signed form in a folder cannot tell you the same asset failed twice inside its warranty. See how Atom AI assistants hold the job, its cost and the asset history as one record.
See Atom AI assistants

A completion report versus the work order it closes

People reasonably ask why this is not just the work order with more fields on it. They are two documents written at opposite ends of the same job.

AspectThe work orderThis completion report
When it is writtenBefore the work, to request and authorize itAfter the work, to record what actually happened
What it describesWhat should be done, and by whenWhat was done, what caused it, and what it cost
Who signs itWhoever raises or approves the jobThe technician and the requester, separately
What it provesThat the work was authorizedThat the work is finished, and to whose satisfaction
What it says about moneyAn estimate at bestLabor, parts, contractor and access, totalled with tax
If you do not have itYou cannot tell who asked for whatYou cannot tell whether closed means finished

The gap between the two is where closure rates go wrong. A work order can be marked complete in any system by one person clicking one button, and nothing about that click distinguishes a job that was properly finished and tested from one that was abandoned when the part turned out to be on order. The completion report forces the distinction into the open: an outcome ticked once, a cause recorded, tests named, and a requester signing to say they accept it. That is also why the two documents should not be merged. The work order is a live instruction that changes while the job runs. The completion report is a fixed statement made once, at the end, by somebody who is willing to sign it. Combining them produces a document that is edited after it is signed, which is the one thing a signature is supposed to prevent.

When the template starts to feel limiting

A signed form closes one job cleanly. It tells you almost nothing across a hundred of them, and it fails in four predictable ways.

  • Warranty windows expire silently

    Every report carries an expiry date written in a document that gets filed on the day it is signed. Nothing raises a hand when the same asset fails six weeks later and the claim is still live.

  • You cannot see which closures did not hold

    The useful figure is how often fully resolved stays resolved. Answering that means matching later jobs back to earlier reports on the same asset, by hand, one at a time.

  • The report and the work order drift apart

    One lives in a folder, the other in a system, and only a person connects them. A job can be closed in one and left open in the other without anything noticing.

  • Repeat parts on one asset stay invisible

    The same component replaced twice in four months is the finding worth having. On paper it is two part numbers on two reports that nobody reads side by side.

What running this in Facilio looks like

The template is the paper version of this closure. The fields are the same ones; the difference is that the outcome, the cost and the warranty attach to the asset rather than to a filed document.

  • Work Completion Validator

    Fully resolved has to be earned

    On paper the outcome is whichever box somebody ticked. Work Completion Validator holds the closure against its evidence, so a job closed as fully resolved with no test recorded and parts still on order is caught before it closes.

  • Ops Performance Intelligence

    Warranty expiry stops being a filed date

    The warranty window sits against the asset and the part, so a failure inside it surfaces as a claim rather than being quoted, invoiced and paid as a fresh job.

  • Audit Report Intelligence

    Closures that did not hold become visible

    Because each report is attached to the asset, a job that reappears within weeks reads as a reopened failure rather than a new one, which is the number that tells you what closure rate is really worth.

  • Contractor Work Tracker

    Cost and acceptance sit with the contractor

    Hours, parts, charges and whether the requester actually signed are held against the contractor record, so an invoice can be checked against an accepted completion rather than taken on trust.

Hallucination-free by design. Atom AI answers from the records in your tenant rather than generating plausible text, so an empty field reads as empty rather than filled in for you.

Frequently asked questions

What is a work order completion report?

A work order completion report is the document that closes a finished job. It records the original work order and what was requested, who carried the work out and when, what was actually done and the cause of the problem, the labor and parts used and the total cost, whether the job is fully resolved or needs following up, any warranty attached to it, the requester's rating, and the signatures that close it.

It is written after the work, not before, and it is the record the person who raised the job signs. That is what separates it from the work order itself, which is an instruction issued beforehand.

What should a work order completion report include?

The reference block tying it to the original work order, who completed the work with times on and off site, a summary covering what was done, the cause found and the tests run afterwards, and the condition the equipment was left in.

Then the money and the outcome: a labor table, a parts table, a cost build-up with tax and what is chargeable, one ticked outcome, a follow-up block if it is not fully resolved, a warranty register with an expiry, the requester's rating, and three signatures for completion, acceptance and approval to charge.

What is the difference between a work order and a completion report?

The work order is written before the job to request and authorize it, and it describes what should happen. The completion report is written after, and it describes what did happen, what it cost, and whether it is genuinely finished.

They are also signed by different people for different reasons. A work order is signed by whoever raises or approves the job. A completion report is signed twice: the technician stating the work is done, and the requester accepting it.

What do you do when a job is only partly finished?

Tick partial rather than fully resolved, and complete the follow-up section. It asks what still needs doing, why it could not be finished, the follow-up work order number, who it is escalated to if anybody, a target date, and whether the requester has been told.

The field people skip is whether the asset is safe to use in the meantime, which takes yes, no, or with restrictions. On a partial closure that answer is the single most important line on the form, because somebody is going to use the equipment before the follow-up happens.

Why does it matter which outcome you tick?

Because a job closed as fully resolved that comes back next week is recorded as a brand new fault. The connection between the two visits is lost, your reactive workload looks higher than it is, and the underlying problem never surfaces as a pattern.

Closing the same job honestly as partial, with a follow-up work order number against it, keeps the two connected. The pressure always runs the other way, because partial looks worse on a dashboard, but a tidy closure rate built on optimistic ticks tells you nothing about what is actually breaking.

Why record warranty on a completion report?

Because it is the only moment anybody knows the dates. The part was fitted today, the cover runs from today, and the expiry is calculable right now by the person holding the paperwork.

The payoff comes months later. If the same component fails inside that window it is a manufacturer or contractor claim rather than a chargeable job, and almost nobody checks unless the expiry was written down at completion. In the Excel version the days remaining count down on their own.

Should the requester sign it?

Yes, and get the rating at the same time. The requester signature is what turns your record of the work into their acceptance of it, which matters a great deal if the job is being charged or if there is any dispute later about whether it was done.

Collect the satisfaction rating on site while the technician is still there. A survey emailed three days later has a poor response rate and mostly measures how people feel about receiving surveys.

Can I edit and rebrand this template?

Yes. It is free to use, edit, rename and put your own logo on, internally or for clients. No attribution required.

The Word version is the one to edit if you want to change the outcome wording or match your own approval levels. The Excel version is the one to use if you want the labor and parts tables to total themselves, the warranty countdown, and the Completion Log tab that trends cost, outcome and satisfaction across every job you close.

In one paragraph

A completion report is written after the work, by the person who did it, and signed by the person who asked for it. Tie it to the original work order and copy the request in as it was raised rather than as it was understood. Record what was done, the cause where you found one, and the tests you ran to prove it, then the condition the equipment was left in. Build the cost up in parts, labor, contractor charges and access before totalling it, so the figure can be explained rather than defended. Then tick one outcome and be honest about it, because a partial closed properly with a follow-up number stays connected to its own history, while the same job closed as fully resolved comes back as a stranger. Record the warranty expiry while you still know it, take the satisfaction rating on site, and get all three signatures before you leave.

The template is the floor, not the ceiling

Take the report; it will close a job cleanly and give you something a requester will sign. When a folder of signed forms stops answering the question of whether closed really means finished, a connected CMMS holds it as data: outcomes attached to assets, warranty windows that raise a hand instead of expiring quietly, repeat parts visible on the second replacement rather than the fifth, and cost you can trace from the invoice back to the hour.

Work Order Completion Report Word · Excel · PDF